A groundworks gang arrives on a Monday with four operatives. Two hold cards that expired in July. Nobody caught it, because the induction pack went...
The first you hear about it is a phone call on a Tuesday. Environmental health have taken three complaints from the flats opposite, the breaker...
A soft strip on a 1970s office block stopped on day four. The gang opened a riser on the second floor and found pipe lagging...
It is Saturday afternoon and someone in your commercial team is still measuring. The tender closes Tuesday. Drawings came in late, the bill has to...
A 13-tonne excavator finished its last pull on a Tuesday. The site closed out that Friday, the foreman moved on to the next job, and...
Open the RAMS for the job you mobilise on Monday and check the site address. On a lot of sites it is the address of...
A fit-out firm took a job on the assumption that main contractor and principal contractor were two names for the same thing. They held the...
The developer behind a three-storey office refurbishment had been the project’s principal designer for four months and had no idea. Asbestos survey done, soft strip...
A fit-out contractor started a three-storey refurbishment last spring believing the architect held the principal designer role. The architect believed the client’s project manager had...
A pre-demolition audit is a structured survey of a building carried out before demolition to identify what materials it contains, in what quantities and condition,...