Category: Insights

Intelligent Transformation Starts With Intelligent Thinking.

A construction phase plan (CPP) is the health and safety document that CDM 2015 requires for every construction project in Great Britain — from a...

Technical due diligence (TDD) is the structured technical investigation of a site, building or development opportunity carried out before you commit to it — before...

Cost modelling is the practice of building a structured, assumption-driven model of a project’s costs — so you can test decisions before you commit to...

A site diary is the daily record of what actually happened on a construction or demolition site: who was there, what work was done, what...

A POWRA (point of work risk assessment) is a short, task-specific safety check carried out by the person doing the work, at the place the...

A variation order in construction is a formal instruction that changes the scope of the works after the contract has been signed — adding work,...

There is a number that should stop every director in UK construction in their tracks. Research by the Get It Right Initiative found that the...

AI in demolition means assistive technology that surfaces the data your business already holds – across estimating, tendering, compliance and plant – and turns it...

A RAMS is a Risk Assessment and Method Statement: a paired document that identifies the hazards on a job and sets out the safe, step-by-step...

A Section 61 demolition application is a request for prior consent from the local authority to carry out noisy or vibration-generating demolition and construction works,...