Intelligent Transformation Starts With Intelligent Thinking.
The survey arrives with the tender pack. Forty pages, a UKAS logo on the cover, a register of eleven items, all low risk. Two weeks...
The suspended ceiling in a 1980s office block comes down in an afternoon. What sits above it decides the next fortnight. Cast-in conduit that appears...
The propping scheme was designed off a survey, and the survey was drawn from the 1987 record drawings. In 2004 a tenant took out a...
Demolition is programmed to start on the 5th. The client signed three weeks later than anyone planned for, so the notice to the council went...
Your grab lorry pulls onto the weighbridge and the operator asks for your carrier registration number and an EWC code before he will take the...
A soft strip on a 1970s office block stopped on day four. The gang opened a riser on the second floor and found pipe lagging...
A pre-demolition audit is a structured survey of a building carried out before demolition to identify what materials it contains, in what quantities and condition,...
It’s Sunday evening and your estimator is measuring a four-storey office block off PDF drawings. The tender goes in on Tuesday. The last job anything...
A Section 61 demolition application is a request for prior consent from the local authority to carry out noisy or vibration-generating demolition and construction works,...