For large-scale infrastructure programmes

Programme data you can trust, in time to act on it.

Pick the challenge that’s costing your programme time and money. We put the fix into the systems you already run, from P6 to your cost system and CDE, on your own data, in weeks. No multi-year data programme before anything works.

Book a 30-minute fix callSee the fixes ↓
Experience on projects including
MaceCrossrailHeathrowHinkley Point CNuclear Decommissioning Authority
Pick your problem

Common problems for infrastructure programmes. Each one has a fix.

Pick the one that’s costing you most time and money. We connect the fix to your data and get your team using it.

Business cases built on estimates nobody trusts

Should-cost estimates and real benchmarks

How we fix it

Estimates built to a standard cost breakdown and benchmarked against market rates and your own outturn, with scenarios for inflation, productivity and contingency. Cost certainty earlier, and contingency you can defend.

Cost intelligenceFix this →
Months and millions spent setting up the programme

Programme set up in weeks, not months

How we fix it

PMO, controls framework, WBS and cost breakdown, reporting templates, supplier onboarding and data requirements, baseline schedule and cost models, all stood up from proven templates and your own standards. Your team starts managing delivery instead of building the machinery to manage it.

Programme mobilisationFix this →
Consents and their conditions holding up delivery

Consents tracked before they become critical path

How we fix it

Every consent, condition and stakeholder commitment tracked against the programme, with deadlines and discharge evidence surfaced early so nothing on site waits for paperwork.

Consents & stakeholdersFix this →
Supply chain risk hidden in the tiers below

Supply chain risk seen early

How we fix it

Financial health, capacity and performance of your tier 2 and 3 suppliers tracked in one place, with early warnings when something changes, so a failure doesn’t arrive as a surprise on the programme.

Supply chain riskFix this →
Schedule risk analysis run once a quarter

Scenario modelling on the live schedule

How we fix it

Schedule risk analysis of the kind you run in Safran Risk, refreshed from live P6 data instead of a quarterly workshop. Schedule quality is checked first, then what-if scenarios, P50 and P80 dates and joint confidence run in hours, not weeks.

Schedule risk & scenariosFix this →
Drawing and model revisions out of sync

Everyone building from the right revision

How we fix it

Your CDE checked continuously against ISO 19650 status and revision rules. Superseded drawings are flagged, models, drawings and RFIs are reconciled, and site teams are warned before they work from an out-of-date revision.

BIM & information managementFix this →
Health and safety risk not linked to the programme

Safety risk modelled against the schedule

How we fix it

High-risk activities, workforce numbers and simultaneous operations mapped against the programme, so clashes like lifting over live work or two teams in one possession are flagged weeks ahead, not discovered on the day.

H&S risk planningFix this →
Technical queries and RFIs stuck in a queue

Technical queries answered faster

How we fix it

TQs and RFIs logged, routed and chased automatically, with suggested answers drawn from specifications, drawings and previous responses. Designers review and approve, and site stops waiting.

TQs & RFIsFix this →
Interfaces between packages falling through the gaps

Every interface owned and tracked

How we fix it

Interfaces between packages, contractors and third parties logged with owners, dates and dependencies, linked to the programme and design, so a missed hand-off shows up before it becomes a delay.

Interface managementFix this →
Programme reporting pulled together by hand across the supply chain

Period reports that build themselves

How we fix it

Cost, schedule, risk and progress data pulled from your own systems and your suppliers’ returns into one view, so the period report is produced automatically and the PMO spends its time on analysis, not assembly.

Automated reportingFix this →
Cost and schedule risk seen too late to act

Early warning on cost and schedule

How we fix it

CPI, SPI, EAC and P80 exposure tracked continuously, with slippage flagged red or amber as it starts and the reason it’s blocked. You see the problem in the period it begins, not three periods later.

Project controlsFix this →
Early warnings and compensation events piling up

Contract notices under control

How we fix it

Every early warning and compensation event tracked against its NEC time limits, with quotations and assessments drafted from site records and the programme. Nothing is lost to a time bar and the backlog stops growing.

NEC contract managementFix this →
Assurance evidence scattered across systems

Assurance-ready, all the time

How we fix it

Decisions, approvals, changes and test evidence captured against the programme as they happen, with a full audit trail. Gateway reviews and audits draw on records, not a scramble through inboxes.

AssuranceFix this →
Carbon reporting assembled at the end of every period

Carbon tracked as you deliver

How we fix it

Embodied and operational carbon captured from design, procurement and site data as the work progresses, ready for PAS 2080 reporting and client returns without a separate exercise.

Carbon & sustainabilityFix this →
Final account arguments and no clear record of what happened

Close-out built on evidence, not memory

How we fix it

AI pulls diaries, programme updates, instructions, NEC notices and correspondence into one timeline of what actually happened and why. Final accounts are agreed faster, payment disputes are settled on evidence, operations inherit usable asset data, and the lessons carry into your next programme.

Close-out & final accountFix this →

Not seeing the challenge your programme is facing? Give us a call on +44 (0)203 442 8498 →

How it works

No discovery phase. Nothing to rip out.

01

Pick the problem

A 30-minute call. You tell us which one is costing you most. We tell you straight whether we can fix it.

02

We plug into what you already use

Primavera P6, Safran, Asta, your cost and ERP systems, Bentley, Autodesk and your CDE, Power BI and the spreadsheets in between. Nothing gets ripped out.

03

Your team uses the fix

Working on your own jobs in weeks, at a fixed price agreed before we start. Add the next fix when the first one has paid for itself.

The questions everyone asks

Do we have to replace our systems?

No. The fix sits alongside what you already run and works from your own data. Your accounts, your drawings, your spreadsheets stay where they are.

What does it cost?

The first fix is a fixed price, agreed before we start, based on the problem you pick. You only add more if it earns its keep.

Who’s in control of the AI?

You are. Every agent has an owner and an approval level, anything important waits for a person to sign it off, every action is logged, and you can switch any of it off.

Where does our data live?

In our secure managed environment or inside your own cloud tenancy, your choice. It is only ever used for your business: never used to train AI models, never shared with public AI tools and never reused for anyone else. Access is role-based, so people only see the jobs and tools they’re meant to.

Bring the report that takes too long

Thirty minutes. Bring last period’s programme report and we’ll show you what the fix looks like on your own data.

Book a 30-minute fix call
Certified and accredited
ISO 9001Quality management
ISO 27001Information security
GIRI memberGet It Right Initiative
Technology partners
Microsoft Solutions PartnerAWS PartnerGoogle Cloud PartnerOracle Partner
Surtori

Intelligent transformation for the built environment.

Office

Surtori Ltd
5th Floor, 167–169 Great Portland Street
London W1W 5PF

Talk to us

contact@surtori.com
+44 (0)203 442 8498
LinkedIn

Next step
Book a 30-minute fix call