Intelligent Transformation Starts With Intelligent Thinking.
Open the RAMS for the job you mobilise on Monday and check the site address. On a lot of sites it is the address of...
The developer behind a three-storey office refurbishment had been the project’s principal designer for four months and had no idea. Asbestos survey done, soft strip...
A fit-out contractor started a three-storey refurbishment last spring believing the architect held the principal designer role. The architect believed the client’s project manager had...
An F10 notification is the form a client submits to the Health and Safety Executive to notify a construction project under the Construction (Design and...
AI in construction means using software that can read, draft and predict — applied to the document-heavy, judgement-heavy work that currently consumes estimators, quantity surveyors,...
A POWRA (point of work risk assessment) is a short, task-specific safety check carried out by the person doing the work, at the place the...
A RAMS is a Risk Assessment and Method Statement: a paired document that identifies the hazards on a job and sets out the safe, step-by-step...
A Section 61 demolition application is a request for prior consent from the local authority to carry out noisy or vibration-generating demolition and construction works,...